With its METANmax program, BTS Biogas offers professional and individual, biological support for the biogas plant.
The customer can choose between different support programs and choose a level of support corresponding to his/her needs. On-site biogas plant analyses by BTS Biogas experts as well as extensive evaluations in the METANLab laboratory by a team of biologists ensure the safe commissioning and optimal operation of the biogas plant.


Download our booklet

  • METANmax Deutsch
  • METANmax italiano
  • METANmax english
  • METANmax español
  • METANmax français
  • METANmax български
  • METANmax čeština
  • METANmax português
  • METANmax 日本人
  • METANmax român

METANmax


METANmax

Professional biological support program

METANmax

The optimal solution for the biogas plant: Consultation with experts with years of experience.
METANmax offers the best package for the biogas plant in every case:


  • TESTmax

    Using a fermentation experiment for a single product or a product mixture, the biogas yield, methane proportion, and the stability of the biological process can be defined.


  • TESTmax


  • STARTmax

    To ensure a smooth start-up
    Duration: 6 months, starting with the first sampling.

    • Facilities training on-site
    • Filling - start-up directions
    • Delivery of the protocol template (for the duration of support)
    • Sample plan (sampling every 2 weeks), transfer of sample containers, DHL boxes, labels, instructions for sampling
    • 12 fermenter content analyses (including sample transport)
    • 6 secondary fermenter analyses (including sample transport)
    • An analysis includes:
      • Determination of the pH value
      • Determination of ammonium
      • Determination of dry matter
      • Determination of organic dry matter
      • Fatty acid spectrum
    • Telephone support 24/7, 365 days a year
    • Bi-monthly on-site consultation
    • Remote monitoring
    • 1 inspection of oil level, temperature, gas measurement
    • 2 evaluations of the analysis results as well as consultation concerning the latter on-site (after 3 months and after 6 months)

    This comprehensive biological support by the METANmax experts enables the biogas plant to be commissioned in the shortest possible time and under optimum conditions.


  • STARTmax


  • CONTImax

    For permanent, high standard performance
    Duration: 12 months

    • Delivery of the protocol template (for the duration of support)
    • Sample plan (sampling every 4 weeks), transfer of sample containers, DHL boxes, labels
    • 12 fermenter content analyses (including sample transport)
    • 12 secondary fermenter analyses (including sample transport)
    • An analysis includes:
      • Determination of the pH value
      • Determination of ammonium
      • Determination of dry matter
      • Determination of organic Dry matter
      • Fatty acid spectrum
    • Telephone support 24/7, 365 days a year
    • Monthly on-site consultation
    • Remote monitoring
    • 2 inspections of oil level, temperature, gas measurement
    • 4 evaluations of the analysis results as well as consultation concerning the latter on-site (after 3 months and after 6, 9 and 12 months)
    • 2 analyses of the digestate

    The METANmax experts analyze the specific situation of the plant and bring the plant to continuous optimal production.


    CONTImax LIGHT

    For the permanent control of the system
    Duration: 12 months

    • Sample plan (sampling every 4 weeks), transfer of sample containers, DHL boxes, labels
    • 12 fermenter content analyses (including sample transport)
    • 12 secondary fermenter analyses (including sample transport)
    • An analysis includes:
      • Determination of the pH value
      • Determination of ammonium
      • Determination of dry matter
      • Determination of organic dry matter
      • Fatty acid spectrum
    • Telephone consultations
    • 1 evaluation of the analysis results as well as consultation concerning the latter on-site (after 12 months)

    The results are generally available in 2 days. The customer receives the results via email or fax, receives a telephone notification and receives an exact description of the results.

    The biogas plant is regularly inspected using specific analyses explaining the progress of the biogas plant and its biological state.


  • CONTImax


  • POWERmax

    For permanent, high standard performance
    Duration: 12 months

    • Delivery of the protocol template (for the duration of support)
    • Sample plan (sampling every 4 weeks), transfer of sample containers, DHL boxes, labels
    • 12 fermenter content analyses (including sample transport)
    • 12 secondary fermenter analyses (including sample transport)
    • An analysis includes:
      • Determination of the pH value
      • Determination of ammonium
      • Determination of dry matter
      • Determination of organic dry matter
      • Fatty acid spectrum
    • Telephone support 24/7, 365 days a year
    • Bi-monthly on-site consultation with specialists
    • Remote monitoring
    • 2 inspections of oil level, temperature, gas measurement
    • 4 evaluations of the analysis results as well as consultation concerning the latter on-site (after 3 months and after 6, 9 and 12 months)
    • 2 analyses of the digestate

    The METANmax experts analyze the specific situation of the plant and bring the plant to continuous optimal production. 


  • POWERmax


  • HELPmax

    Even plant operators without a BTS Biogas plant can benefit from the professional biological support service METANmax.

    The BTS Biogas experts analyze the specific plant situation through an on-site visit, analyze the containers, and bring them to a higher standard and continuous production.


  • HELPmax

To top


METANlab

The first laboratory for biogas in Italy

METANlab

The BTS Biogas Biogas laboratory in Porto Mantovano is unique in Italy. Here, samples are analyzed and measured values are determined in order to ensure the durable, safe and profitable operation of the biogas plants.
We collect empirical data according to scientific methods that describe and optimize production process and the biogas yield under different conditions.
Through this research work, we can continue to improve planning and development as well as the operation of the biogas plants.

  • The search for metabolic products such as volatile fatty acids (e.g. acetic acid, propionic acid, butyric acid, ...), whose accumulation represents a disturbance of the microbiologic process in the biogas plant;
  • Determination of the dry matter and the organic dry matter, whose factors for evaluating the consistency of the digestibility of the feed in the biogas plant are significant;
  • Determination of ammonium and ammonia for discovering a potential inhibition of the microbiological process;
  • Determination of the available nutrients in the digestate;
  • Determination of the biogas yield for a product using the batch process.

NIRS

NIRS in the laboratory - The new system to analyze and monitor the biomass values

SpectraStar 2400 RTW
SpectraStar 2400 RTW
Provided sample container
Provided sample container

Description:
The SpectraStar 2400 RTW is the latest generation of NIR spectrometers (NIR stands for Nearly Infrared). Using infrared rays, it carries out fast and precise analyses of the chemical and physical properties of silage and hay. When doing so, the measurement results are used for the quantitative determination of organic ingredients and ingredient groups.

Function:
The sample is irradiated in the NIR spectrometer in the wavelength range from 1,200 to 2,400nm and the reflected radiation component is measured depending on the wavelength. This allows precise results to be determined for main components such as fat, protein, moisture, starch, fibers, carbohydrates, amino acids and sugars. The NIR range over 1,800nm makes even more sensitive analysis possible for measuring sugars, amino acids, fatty acids, starch, fibers and other components in low concentrations.

Therefore, the intensity of the reflected light from the NIR spectrometer can lead to conclusions concerning the quantity of these ingredients.

Advantages:

  • From a single measurement, multiple components as well as up to 26 parameters can be determined simultaneously.
  • Reliable and precise measurement results
  • Creation of calibration curves by the METANlab team
  • Analysis of silo maize and other silages, grasses (e.g. straw or hay) and dry feed
  • Analysis of liquid digestate

Mobile NIRS

Various possibilities of use, such as on the BIOaccelerator, on a selfpropelled vehicle, or on a loader.

mobiles NIRS

METANmax n

Preparation solution for biogas power plants based on metal salt mixtures and additives

METANmax n
  • Reduction of odours;
  • Total nitrogen content in the fermenter also over 10 kg/m3;
  • Use of dry chicken manure in high quantities;
  • Automatic delivery system of the product is controlled by the PLC;
  • Certified storage systems, even for high quantities;
  • Introduction through manure pipeline, slurry tank or direct entry into the biogas power plant fermenter;
  • Binding hydrogen sulfide and ammonia gases into the fermenting substrates;
  • Generating an optimum environment for anaerobic bacteria. The result is a high efficiency for the biogas power plant;
  • Increasing the digestate values of the fermented substrate with sulfur and ammonium compounds;
  • Fulfilling the EU Organic Regulation (EWG) 2092 / 91;
  • Extending the oil drain intervals for the CHP and the unit service life;
  • Reducing the ammonia gas values to 0 - 5 ppm NH3/m3


Extensive testing in our METANlab

Extensive testing in our METANlab

Extensive testing in our METANlab

Extensive testing in our METANlab

Extensive testing in our METANlab

Extensive testing in our METANlab

Extensive testing in our METANlab

Extensive testing in our METANlab

Extensive testing in our METANlab

Extensive testing in our METANlab

Extensive testing in our METANlab

Extensive testing in our METANlab

New American Sharholders in BTS Biogas

US Investor Group Acquires Large Minority Stake
PRESS RELEASE »

  • GTS Syngas
  • TS energyGROUP